Building Type – Tier III Telecom Facility

Project Description:- Enhancement to DC Power System – Resilience and restructuring to the power

Duration:- 12 - 14 Weeks

Power Design Projects Ltd were contracted to carry out the project enhancement to the DC 48V electrical power system, the back system to the facility utilising single power supplies from the incoming mains supply feeding the DC power network with dual supplies to the equipment racks.

  • DC Power System
     

  • DC Battery Rack Supporting Power Plant

  • AC incoming mains re-configuration

  • Dual Input Distribution